Alternative Project Delivery

Glacier Construction Co., Inc. recognizes that the traditional design-bid-build project delivery method is not always the best approach to meeting the needs of the customer.  Even in our current hyper-competitive marketplace, these methods often miss huge opportunities for cost and schedule savings.  Glacier has learned that the most important audience, the end user, can often lose when using the traditional contractor - Owner - engineer polarized triad.  Having engineers, customer operations staff and managers, and the constructor as part of the project team from the early planning stages provides a more effective environment in which to design, construct and transfer a project.

Glacier is a corporate member of the Design-Build Institute of America and the Construction Management Association of America.  A big part of our success with integrated project delivery is the personal dedication of individuals who are members of organizations such as the US Green Building Council and the Project Management Institute.  For more information, or to arrange for a presentation on potential benefits of alternative project delivery methods, please contact the Estimating Department at (303) 221-5383 or email estimating@gcci.com.

Projects that have used alternative project delivery methods:

 

 1275: Cityset Lift Station - Phase II

Owner: City of Glendale - Sonley Retail
Construction Manager: Waner Construction

Project Delivery Method: Design-Build

 

 1266: Jim Bridger Sewage Treatment Plant

Owner: PacifiCorp Energy

Project Delivery Method: Design-Build

 

 1046: Wastewater Treatment System for Leprino Foods

Owner: Leprino Foods

Project Delivery Method: Construction Manager At-Risk (CMAR)

 

2927: Aeration Basin and Blower Building Roof Replacement

Owner: Evergreen Metropolitan District

Project Delivery Method: Construction Manager At-Risk (CMAR)