Spurgeon Water Treatment Plant Clearwell Replacement

Owner: Left Hand Water District
Designer: Burns & McDonnell
Value: $2,869,000
Award Date: May 30, 2018
Anticipated Completion Date: December 31, 2018

Project Overview:
Demolition of existing 0.5 million gallon post-tensioned concrete tank and replacement with a new 0.65 million gallon baffled post-tensioned tank and associated inlet, outlet, drain, overflow, sampling piping, valves, and valve vault. Work includes the replacement of a 24" Venturi meter with a 24" magnetic flow meter in an existing meter vault. The work also includes all electrical and instrumentation/controls equipment installation for the new tank and meter.