Horizontal Collector Well No. 119 Pump Station

Owner: South Adams County Water & Sanitation District
Designer: Mueller Engineering
Value: $2,030,770
Award Date: October 11, 2017
Anticipated Completion Date: June 18, 2018


Project Overview:
Installation of 900 sq/ft pump station with brick walled HVAC enclosure on a concrete foundation slab supported on existing 16' diameter horizontal collector well caisson. Associated site work involves earthwork, riprap bank protection, drainage facilities, erosion control, yard piping, a precast BFV vault, and chain link fencing. Two vertical turbine pumps and motors, two variable frequency drives, electrical and controls, HVAC, interior piping, valves, meters, sodium hypochlorite tank, metering pump, generator transfer switch, and a liquid filled transformer.