2017 Infrastructure Improvements

Owner: South Adams County Water & Sanitation District
Designer: Bruns & McDonnell
Value: $998,400
Award Date: TBD
Anticipated Completion Date: September 5, 2018

Project Overview:
Lift Station No. 2 work includes the replacement of the equalization basin roof deck. The work at Williams Monaco includes but is not limited to the replacement of the gravity thickener mechanism, addition of a manway into the gas holding Secondary Digester, repair of the seal to Primary Digester No. 2, replacement of the existing manual bar screen with an Owner-provided mechanical rake screen, modifications to the shallow well non-potable water line, Headworks building modifications, and renovation of a section of storm drain.